Hot Servery Replacement
CKSC were engaged to replace the end-of-life bain maries and upgrade the overall servery for 800 room Pilbara Village.
About this project
Scope
-
Replace bain maries with Ceramic Heated Glass units. Eliminating the injury risk associated with hot water, wear and tear on heating elements, and improving hygiene standards.
-
Install two bain marie hot cupboards and custom under bench shelving.
-
Supply and install custom stone top, allowing units to be installed flush with the bench.
-
Design and supply custom façade panels
-
Supply and install full length multicolour LED strip lighting
CKSC has a dedicated skilled team able to assist you with identification, sourcing and supply of spare parts for all types of Commercial Kitchen & Laundry Equipment.